Eddie V’s, Orlando

Orlando, FL – Ace Air Conditioning has been awarded the mechanical contract for Darden’s new upscale seafood restaurant to be built on Orlando’s Restaurant Row near the tourist attractions and theme parks.  Eddie V’s Prime Seafood is set to open in October 2013.

Ace will work alongside general contractor, Haley Construction.  The beautiful building is to feature floor to ceiling windows as well as a 450 square foot glass wine room which will have its own air conditioning units to keep the wines at the proper temperature separate from the rest of the building.

Eddie-V's-SQ-wine-entry

 

Ace Air Conditioning will begin work at Eddie V’s May, 2013.

Category: News No Comments

Related Posts

5 Summer Time AC Mistakes!

1. Not Changing Air Filters Even if it looks like your home is clean and sleek, there are microscopic particles that ci... Read More »

Love’s Travel Stop -St. Clair, MI

Check out what our new construction crew has been working on! This Love's Travel Stop located in St. Clair, MI if fully ... Read More »

New Construction Installation -Athens, GA

Check out this new construction install at a Texas Roadhouse in Athens, GA. A total of 5 Trane units- 4 Packaged Gas/Ele... Read More »